Fiscal Year: 2001
|
Project Dates: 9/17/01 - 1/14/02
|
|
Contract Number: DACW65-01-C-0053
|
|
Project Description: Dredging Cape Henry under the same contract number continued in April of 2002.
|
|
Maintenace / New Work: Maintenance
|
Federal / Regulatory: Federal
|
|
Total Project Cubic Yards: 1641140
|
Total Days of Dredging: 146
|
Total Hours of Dredging: 1499.6
|
|
|
Type of Material: Fine sand with shell & shell fragments (1993 BO)
|
Disposal Method(s) for Material: Not in ODD.
|
|
Total Turtle Takes: 3
|
|
|
Observer Company Used: REMSA
|
Relocation Trawling? Yes
10/13/01-11/12/01, 12 hrs/day; 1 loggerhead found dead from boat strike
|
|
Relocation Company: Remsa, F/V Captain Tuck
|
|
Loggerheads: 2
|
Greens: 1
|
|
Kemp's Ridley: 0
|
Leatherbacks: 0
|
|
Hawksbill: 0
|
|
|
Total number turtles relocated: 3
|
Are Relocation Reports Available? Yes
|
|
Are Dredging Records Available? Yes
|
Are original turtle take data still available? Yes
|
|
Description of mitigation measures/dates used: Deflectors (Glynn Banks onboard Dredge Bayport 1-4 Oct for evaluation and calibration of deflector), relocation trawling (10/13/01-11/12/01), windows (12/1-3/31)
|
|
Other Remarks: Whale sightings began in October with most distances half mile away. Several reports of crushed turtles stranded at nearby First Landing State Park & surrounding areas. A tiger shark was injured during a trawl and taken to VA Marine Science Museum.
Total CY is an estimation based on contractor daily reports.
|