| Project: Wilmington Harbor - Baldhead Shoal Channel & Smith Island |
|
Dredging Company: Great Lakes Dredge & Dock Company
|
Dates Dredge Worked: 2/5/00-3/10/00; 4/3/00-4/5/00
|
|
Deflector Used: Yes
|
Total cubic yards this dredge: 572370
|
Total days this dredge worked: 38
|
Total hours this dredge worked: 517.13
|
|
|
Draghead Type: N/A
|
Draghead Size: N/A
|
Number of Dragheads: 2
|
|
|
Silent Inspector: No
|
Dredge Logs Available? No
|
|
Screening Type: Inflow
|
Screening Coverage: 76-100
|
Percent Observer Monitoring: 50% cetacean watch (2/5-2/29); 100% as of 1 Mar
|
|
|
Bycatch: N/A
|
|
Other Remarks: Inflow screening and use of deflectors began 1 Mar. 248 loads dredged.
|