Fiscal Year: 2009
|
Project Dates: 10/31/08 - 11/15/08
|
|
Contract Number: W912P8-08-C-0072
|
|
Project Description: This project was shutdown on September 5 2008 due to a break down to the dredge. Restarted on Oct 31, 2008.
|
|
Maintenace / New Work: Maintenance
|
Federal / Regulatory: Federal
|
|
Total Project Cubic Yards: 237772
|
Total Days of Dredging: 16
|
Total Hours of Dredging: 150
|
|
|
Type of Material: Sand and clay
|
Disposal Method(s) for Material: OMDS
|
|
Total Turtle Takes: 4
|
|
|
Observer Company Used: East Coast Observers
|
Relocation Trawling? Yes
Totals since restart of project on 10/30/08 : 820 tows (Breakaway #391 & Miss Adrienne #429) and 2 turtles relocated (1 cm from Breakaway and 1 cc from Miss Adrienne).
|
|
Relocation Company: East Coast observers: M/V Miss Adrienne and M/V Miss Breadaway. Two trawlers each on 24-hr basis
|
|
Loggerheads: 1
|
Greens: 1
|
|
Kemp's Ridley: 0
|
Leatherbacks: 0
|
|
Hawksbill: 0
|
|
|
Total number turtles relocated: 2
|
Are Relocation Reports Available? Yes
|
|
Are Dredging Records Available? No
|
Are original turtle take data still available? Yes
|
|
Description of mitigation measures/dates used: Deflectors, relocation trawling (10/30/08-11/14/08)
|
|
Other Remarks: 95 loads by B.E. Lindholm during this re-start.
|