| Turtle Take Date: 6/21/1991 |
Project: Savannah Harbor Entrance Channel |
|
Dredge: Dodge Island
|
Observer Name: Chris Slay
|
|
Observer Company: N/A
|
Are observer reports available? Yes
|
|
Cubic yards: N/A
|
Days worked: N/A
|
Hours worked: N/A
|
|
|
Species: Loggerhead
|
Age: Sub Adult
|
Live / Dead: Dead
|
|
|
Genetic Samples? No
|
Photos Available? No
|
|
Dredge Load: 28
|
Load Time: 1830
|
Time Recovered: 1830
|
|
|
Channel Location: Section 5 between station -425 and -500 (Red)
|
|
Latitude: N/A
|
Longitude: N/A
|
|
Water Surface Temp: N/A
|
Water Column Temp: N/A
|
Air Temp: N/A
|
|
|
Weather: clear, winds SE 10 kts., seas 2'
|
Bycatch associated with take:
|
|
Location Part Recovered: Turtle found lodged in port draghead by crew and lateral screens
|
|
Description of Part Recovered: Specimen barely alive, soon died; carapace severely cracked. 187.5 cm of intestine recovered from lateral screens.
|
|
Head Width: 12.7
|
Plastron Length: 44.4
Plastron Width: 53.3
|
|
Carapace S.L. Length: 0 cm
|
Carapace S.L. Width: 0 cm
|
|
Carapace O.C. Length: 62.5 cm
|
Carapace O.C. Width: 58.4 cm
|
|
Deflector in use? No
|
Condition of Screen/Deflector: Screening working well/no deflectors on dredge Dodge Island
|
|
Relocation Trawling? No
|
Windows? No
|
|
Other Protection Methods in Place: N/A
|
|
Data Source: Observer report, weekly summary, daily report
|
|
Other Remarks: Tides: L 1022 H 1645 = Ebbing
|