| Turtle Take Date: 7/14/91 |
Project: Savannah Harbor Entrance Channel |
|
Dredge: Dodge Island
|
Observer Name: Chris Slay
|
|
Observer Company: N/A
|
Are observer reports available? Yes
|
|
Cubic yards: N/A
|
Days worked: N/A
|
Hours worked: N/A
|
|
|
Species: Loggerhead
|
Age: Unknown
|
Live / Dead: Dead
|
|
|
Genetic Samples? No
|
Photos Available? No
|
|
Dredge Load: 230
|
Load Time: 0330
|
Time Recovered: 0330
|
|
|
Channel Location: N/A
|
|
Latitude: N/A
|
Longitude: N/A
|
|
Water Surface Temp: N/A
|
Water Column Temp: N/A
|
Air Temp: N/A
|
|
|
Weather:
|
Bycatch associated with take:
|
|
Location Part Recovered: Draghead
|
|
Description of Part Recovered: Head and a portion of plastron were recovered from draghead by crew.
|
|
Head Width: 0
|
Plastron Length: 0
Plastron Width: 0
|
|
Carapace S.L. Length: 0 cm
|
Carapace S.L. Width: 0 cm
|
|
Carapace O.C. Length: 0 cm
|
Carapace O.C. Width: 0 cm
|
|
Deflector in use? No
|
Condition of Screen/Deflector: N/A
|
|
Relocation Trawling? No
|
Windows? No
|
|
Other Protection Methods in Place: N/A
|
|
Data Source: Observer report
|
|
Other Remarks: Samples of turtle parts were washed overboard before observer boarded, but Corps inspector was able to make species ID.
|