Southwest Pass - New Orleans District
Project Information
|
Fiscal Year: 1995
|
Project Dates: 2/6/95 - 9/4/95
|
|
Contract Number: N/A
|
|
Project Description: Jetty and bar channel dredging. Total of 7 dredges including one cutterhead used; total cy also includes cutterhead yardage. Approximately 50% (10,818,790 cy) removed from between bar channel, Mile 18.8 Below Head of Pass to Mile 22.0 Below Head of Passes.
|
|
Maintenace / New Work: Maintenance
|
Federal / Regulatory: Federal
|
|
Total Project Cubic Yards: 21643154
|
Total Days of Dredging: 0
|
Total Hours of Dredging: 0
|
|
|
Type of Material: N/A
|
Disposal Method(s) for Material: ODMDS, possibly agitation
|
|
Total Turtle Takes: 0
|
|
|
Observer Company Used: No observers. Crew required to avoid turtles and report sightings or observed parts.
|
Predredge Trawling
|
Predredge Trawling Company: N/A
|
|
Predredge Trawling? No
N/A
|
Are Predredge Reports Available? No
|
|
Loggerheads: 0
|
Greens: 0
|
|
Kemp's Ridley: 0
|
Other: 0
|
Relocation Trawling
Relocation Trawling? No
N/A
|
|
Relocation Company: N/A
|
|
Loggerheads:
|
Greens:
|
|
Kemp's Ridley:
|
Leatherbacks:
|
|
Hawksbill:
|
|
|
Total number turtles relocated: 0
|
Are Relocation Reports Available? No
|
|
Are Dredging Records Available? No
|
Are original turtle take data still available? No
|
|
Description of mitigation measures/dates used: N/A
|
|
Other Remarks: SWP Habitat Characterization Study began in 1995 (Data included depth, salinity, temperature, surface suspended solids, turbidity, & chloride ppm) (see 1995 Annual Sea Turtle Report).
|
Dredges for Project:
Turtle Takes during Project:
- There were no turtle takes by a dredge
|