Turtle Warehouse Title Image
 Blank space image
 
Updated 15:37 CST on 20 Feb 2013
 Black Dot Image Home
 Black Dot Image Disclaimer
 Black Dot Image Introduction
 Black Dot Image Divisions
 Black Dot Image Districts
 Black Dot Image Projects
 Black Dot Image Turtle Species
 Black Dot Image Region
 Black Dot Image Total Cubic Yards
 Black Dot Image Fiscal Year Table
 Black Dot Image Fiscal Year Graph
 Black Dot Image Total Turtle Takes
 Black Dot Image Takes Graphs
 Black Dot Image Fiscal Year
 Black Dot Image Calendar Year
 Black Dot Image Fiscal Year
 Black Dot Image Takes
 Black Dot Image Water Temp
 Black Dot Image References
 Black Dot Image Reports
 Black Dot Image Biological Assessments/ Opinions
 Black Dot Image Sea Turtle Compliance Inspection Checklist
 Black Dot Image Stranding Data
 Black Dot Image Annual Allotted Takes
 Black Dot Image Annual Relocated Turtles
 Black Dot Image Observer Criteria
 Black Dot Image Observer Forms
 Black Dot Image Trawling Form
 Black Dot Image Tagging Form
 Black Dot Image District Checklist
 Black Dot Image Sea Turtle Deflector Draghead-Design Specifications
 Black Dot Image Corps/Industry Hopper Dredge Schedule
 Black Dot Image Florida Shore Protection & Sea Turtle Management System

 

 Blank image space

 Blank image space

Calcasieu Entrance Channel - New Orleans District

Project Information

Fiscal Year: 2010 Project Dates: 4/26/10 - 6/22/10
Contract Number: W912P8-10-C-0030
Project Description: The hopper dredge Bayport began work in the Mile -1.8 to Mile -11.5 bar channel reach. The required depth of dredging was -44 feet Mean Low Gulf (MLG) and the dredging width was 800 feet (full cut). All work was performed in either the agitation mode, or in the dredge and haul mode with diposal into the ocean dredged material disposal site. During this period, the dredge worked a total of 58 days between bar channel indicated above. A total of 273 loads were collected. During this work period the Bayport removed at total of 6,014,562 cubic yards of material (5,185,012 cy by agitation and 829,550 cy by dredge and haul).
Maintenace / New Work: Maintenance Federal / Regulatory: Federal
Total Project Cubic Yards: 6014562 Total Days of Dredging: 58 Total Hours of Dredging: 0
Type of Material: mud Disposal Method(s) for Material: Agitation and ODMDS
Total Turtle Takes: 3  
Observer Company Used: Coastwise Consulting, Inc.

Predredge Trawling

Predredge Trawling Company: N/A  
Predredge Trawling? No
N/A
Are Predredge Reports Available? No
Loggerheads: 0 Greens: 0
Kemp's Ridley: 0 Other: 0

Relocation Trawling

Relocation Trawling? No
N/A
Relocation Company: N/A
Loggerheads: Greens:
Kemp's Ridley: Leatherbacks:
Hawksbill:
Total number turtles relocated: 0 Are Relocation Reports Available? No
Are Dredging Records Available? No Are original turtle take data still available? No
Description of mitigation measures/dates used: N/A
Other Remarks: N/A

Reports

Dredges for Project:

Turtle Takes during Project:

 Blank space image

 Blank space image


Webdate: January 14, 2005
Updated: February 20, 2013
Comments / Whom to contact
Privacy and Security Notice