Fiscal Year: 1997
|
Project Dates: 10/14/96 - 2/23/97
|
|
Contract Number: DACW97C0003; DACW97C0006; DACW97C0011; 97LMN915
|
|
Project Description: Emergency bar channel dredging to restore project depth after extensive shoaling caused by Tropical Storm Josephine.
|
|
Maintenace / New Work: Maintenance
|
Federal / Regulatory: Federal
|
|
Total Project Cubic Yards: 13750000
|
Total Days of Dredging: 371
|
Total Hours of Dredging: 0
|
|
|
Type of Material: Sand, silt, mud, clay
|
Disposal Method(s) for Material: Dredge & haul, agitation, continuous pump-out, side-casting
|
|
Total Turtle Takes: 5
|
|
|
Observer Company Used: Coastwise Consulting
|
Relocation Trawling? No
N/A
|
|
Relocation Company: N/A
|
|
Loggerheads:
|
Greens:
|
|
Kemp's Ridley:
|
Leatherbacks:
|
|
Hawksbill:
|
|
|
Total number turtles relocated: 0
|
Are Relocation Reports Available? No
|
|
Are Dredging Records Available? No
|
Are original turtle take data still available? Yes
|
|
Description of mitigation measures/dates used: Deflectors installed after first turtle take on 10/22/96, windows (11/30-3/31)
|
|
Other Remarks: A series of events were observed during the project that could have impacted turtles in the area: 1) reported red tide in the interior marshes of Breton Sound; 2) surface oil slick on 10/27; 3) transit of a damaged barge possibly leaking vinyl acetate inbound from Gulf through channel on 11/10; 4)commercial activities in vicinity of dredge. Large quantities of floating dead fish observed from the dredge coincided with the red tide and damaged barge.
|