Southwest Pass - New Orleans District
Project Information
|
Fiscal Year: 1997
|
Project Dates: 12/11/96 - 11/9/97
|
|
Contract Number: N/A
|
|
Project Description: Dredging between Mile 4 AHP and Mile 22 BHP and the Crossings. Eight hopper dredges, a cutterhead, and dustpan were used. Below Mile 19 BHP is area of concern for sea turtles in SWP (STA 164-D and seaward); 101 days dredging in area of concern.
|
|
Maintenace / New Work: Maintenance
|
Federal / Regulatory: Federal
|
|
Total Project Cubic Yards: 2000000
|
Total Days of Dredging: 456
|
Total Hours of Dredging: 0
|
|
|
Type of Material: N/A
|
Disposal Method(s) for Material: Agitation, dredge & haul mode
|
|
Total Turtle Takes: 0
|
|
|
Observer Company Used: Coastwise Consulting (Ouachita, Stuyvesant, Wheeler); REMSA (?)
|
Predredge Trawling
|
Predredge Trawling Company: N/A
|
|
Predredge Trawling? No
N/A
|
Are Predredge Reports Available? No
|
|
Loggerheads: 0
|
Greens: 0
|
|
Kemp's Ridley: 0
|
Other: 0
|
Relocation Trawling
Relocation Trawling? No
N/A
|
|
Relocation Company: N/A
|
|
Loggerheads:
|
Greens:
|
|
Kemp's Ridley:
|
Leatherbacks:
|
|
Hawksbill:
|
|
|
Total number turtles relocated: 0
|
Are Relocation Reports Available? No
|
|
Are Dredging Records Available? No
|
Are original turtle take data still available? No
|
|
Description of mitigation measures/dates used: Windows (11/30-3/31), Deflectors used on Eagle 1 but unsure if other dredges had deflectors (8 total).
|
|
Other Remarks: Cubic yards an approximation. See "Baird, B.; Creef, E.; Thibodeaux, B. 1996. Water quality monitoring for sea turtle migration during dredging operations. Miscellaneous Paper W-95-1. Water Quality '96: Proceedinging of the Corps of Engineers 11th Seminar on Water Quality, 26 Feb-1 Mar 1996, Seattle, WA. U.S. Army Engineer Waterways Experiment Station, Vicksburg, MS. Pages 191-196. Southwest Pass exempt from turtle observations
|
Dredges for Project:
Turtle Takes during Project:
- There were no turtle takes by a dredge
|