Fiscal Year: 1999
|
Project Dates: 11/16/98 - 5/28/99
|
|
Contract Number: DACW29-99-C-0002
|
|
Project Description: Bar channel dredging between Miles -1.7 & -32.0 with majority of material removed between Miles -1.7 & -19.2.
|
|
Maintenace / New Work: Maintenance
|
Federal / Regulatory: Federal
|
|
Total Project Cubic Yards: 5655000
|
Total Days of Dredging: 191
|
Total Hours of Dredging: 0
|
|
|
Type of Material: Silt, mud, clay
|
Disposal Method(s) for Material: Agitation (5,500,000 CYS) and dredge & haul mode (155,000 CYS)
|
|
Total Turtle Takes: 0
|
|
|
Observer Company Used: Coastwise Consulting
|
Relocation Trawling? No
N/A
|
|
Relocation Company: N/A
|
|
Loggerheads:
|
Greens:
|
|
Kemp's Ridley:
|
Leatherbacks:
|
|
Hawksbill:
|
|
|
Total number turtles relocated: 0
|
Are Relocation Reports Available? No
|
|
Are Dredging Records Available? No
|
Are original turtle take data still available? No
|
|
Description of mitigation measures/dates used: Windows (11/30-3/31), deflectors not yet required for this project
|
|
Other Remarks: Observers were onboard 11/16/98-11/30/98 and 4/1/99-5/28/99. Water surface temperature during project ranged from 28.3°-18° C, mid-depth 26.7°-18° C. Shrimp trawlers sighted in area 4/27 & 4/29.
|