Turtle Warehouse Title Image
 Blank space image
 
Updated 15:37 CST on 20 Feb 2013
 Black Dot Image Home
 Black Dot Image Disclaimer
 Black Dot Image Introduction
 Black Dot Image Divisions
 Black Dot Image Districts
 Black Dot Image Projects
 Black Dot Image Turtle Species
 Black Dot Image Region
 Black Dot Image Total Cubic Yards
 Black Dot Image Fiscal Year Table
 Black Dot Image Fiscal Year Graph
 Black Dot Image Total Turtle Takes
 Black Dot Image Takes Graphs
 Black Dot Image Fiscal Year
 Black Dot Image Calendar Year
 Black Dot Image Fiscal Year
 Black Dot Image Takes
 Black Dot Image Water Temp
 Black Dot Image References
 Black Dot Image Reports
 Black Dot Image Biological Assessments/ Opinions
 Black Dot Image Sea Turtle Compliance Inspection Checklist
 Black Dot Image Stranding Data
 Black Dot Image Annual Allotted Takes
 Black Dot Image Annual Relocated Turtles
 Black Dot Image Observer Criteria
 Black Dot Image Observer Forms
 Black Dot Image Trawling Form
 Black Dot Image Tagging Form
 Black Dot Image District Checklist
 Black Dot Image Sea Turtle Deflector Draghead-Design Specifications
 Black Dot Image Corps/Industry Hopper Dredge Schedule
 Black Dot Image Florida Shore Protection & Sea Turtle Management System

 

 Blank image space

 Blank image space

Mississippi River Gulf Outlet - New Orleans District

Project Information

Fiscal Year: 2000 Project Dates: 1/7/00 - 4/16/00
Contract Number: N/A
Project Description: Bar channel dredging to restore project depth between Miles -3.3 & -6.9. Majority of dredged material removed between -4.3 & -5.5.
Maintenace / New Work: Maintenance Federal / Regulatory: Federal
Total Project Cubic Yards: 1187245 Total Days of Dredging: 100 Total Hours of Dredging: 0
Type of Material: Mud Disposal Method(s) for Material: Dredge & haul mode
Total Turtle Takes: 1  
Observer Company Used:

Predredge Trawling

Predredge Trawling Company: N/A  
Predredge Trawling? No
N/A
Are Predredge Reports Available? No
Loggerheads: 0 Greens: 0
Kemp's Ridley: 0 Other: 0

Relocation Trawling

Relocation Trawling? No
N/A
Relocation Company: N/A
Loggerheads: Greens:
Kemp's Ridley: Leatherbacks:
Hawksbill:
Total number turtles relocated: 0 Are Relocation Reports Available? No
Are Dredging Records Available? No Are original turtle take data still available? Yes
Description of mitigation measures/dates used: Deflectors, windows (11/30-3/31)
Other Remarks: On 4/18/00 dead Kemp's observed by survey crew in channel (2 days after dredging); shrimping activities in area at that time. Water surface temperature during monitoring ranged from 25.6°-21.1° C.

Reports

Dredges for Project:

Turtle Takes during Project:

 Blank space image

 Blank space image


Webdate: January 14, 2005
Updated: February 20, 2013
Comments / Whom to contact
Privacy and Security Notice