Fiscal Year: 2000
|
Project Dates: 12/26/99 - 6/17/00; 7/3/00 - 7/27/00
|
|
Contract Number: DACW29-00-C-0016
|
|
Project Description: Bar channel dredging between Miles -1.1 & -19.8.
|
|
Maintenace / New Work: Maintenance
|
Federal / Regulatory: Federal
|
|
Total Project Cubic Yards: 6634084
|
Total Days of Dredging: 218
|
Total Hours of Dredging: 0
|
|
|
Type of Material: Silt, mud
|
Disposal Method(s) for Material: Agitation (6,171,304 CYS) and dredge & haul mode (462,780 CYS)
|
|
Total Turtle Takes: 1
|
|
|
Observer Company Used: Coastwise Consulting
|
Relocation Trawling? No
N/A
|
|
Relocation Company: N/A
|
|
Loggerheads:
|
Greens:
|
|
Kemp's Ridley:
|
Leatherbacks:
|
|
Hawksbill:
|
|
|
Total number turtles relocated: 0
|
Are Relocation Reports Available? No
|
|
Are Dredging Records Available? Yes
|
Are original turtle take data still available? Yes
|
|
Description of mitigation measures/dates used: Deflectors not required for this project at this time, windows (11/30-3/31)
|
|
Other Remarks: Observers on board beginning 4/1/00. Water surface temperatures during monitoring ranged from 31.1-21.6° C, and mid-depth temperatures ranged from 31.1-20.5° C.
|