Fiscal Year: 2001
|
Project Dates: 7/16/01 - 8/24/01
|
|
Contract Number: DACW29-01-C-0036
|
|
Project Description: Bar channel dredging between Miles -3.3 & -7.6.
|
|
Maintenace / New Work: Maintenance
|
Federal / Regulatory: Federal
|
|
Total Project Cubic Yards: 316823
|
Total Days of Dredging: 17
|
Total Hours of Dredging: 0
|
|
|
Type of Material: Sand, silt, mud, clay
|
Disposal Method(s) for Material: Dredge & haul mode
|
|
Total Turtle Takes: 1
|
|
|
Observer Company Used: Coastwise Consulting
|
Relocation Trawling? Yes
8/17/01-8/24/01, both loggerheads relocated were female. Turtle's plastron (relocated on 8/22) with fresh scrapes appearing as possible signs of turtle deflector. 7 turtles sighted by crew.
|
|
Relocation Company: F/V Little Ric; Turtle observers: Robert K Metzger; Trawler: Lil Rick
|
|
Loggerheads: 2
|
Greens: 0
|
|
Kemp's Ridley: 0
|
Leatherbacks: 0
|
|
Hawksbill: 0
|
|
|
Total number turtles relocated: 2
|
Are Relocation Reports Available? Yes
|
|
Are Dredging Records Available? Yes
|
Are original turtle take data still available? Yes
|
|
Description of mitigation measures/dates used: Deflectors, relocation trawling (8/17-8/24), Glynn Banks (ERDC) on board to provide expertise
|
|
Other Remarks: Water surface temperature during project ranged from 30°-28.3° C and mid-depth ranged from 29.4°-27.8° C.
|