Calcasieu River & Pass - New Orleans District
Project Information
|
Fiscal Year: 2002
|
Project Dates: 9/5/02 - 9/12/02
|
|
Contract Number: N/A
|
|
Project Description: Bar channel dredging between Miles -9.5 & -12.0.
|
|
Maintenace / New Work: Maintenance
|
Federal / Regulatory: Federal
|
|
Total Project Cubic Yards: 1266931
|
Total Days of Dredging: 13
|
Total Hours of Dredging: 0
|
|
|
Type of Material: Clay
|
Disposal Method(s) for Material: Agitation (1,209,823 cy) and dredge & haul mode (57,108 cy)
|
|
Total Turtle Takes: 0
|
|
|
Observer Company Used:
|
Predredge Trawling
|
Predredge Trawling Company: N/A
|
|
Predredge Trawling? No
N/A
|
Are Predredge Reports Available? No
|
|
Loggerheads: 0
|
Greens: 0
|
|
Kemp's Ridley: 0
|
Other: 0
|
Relocation Trawling
Relocation Trawling? No
N/A
|
|
Relocation Company: N/A
|
|
Loggerheads:
|
Greens:
|
|
Kemp's Ridley:
|
Leatherbacks:
|
|
Hawksbill:
|
|
|
Total number turtles relocated: 0
|
Are Relocation Reports Available? No
|
|
Are Dredging Records Available? Yes
|
Are original turtle take data still available? Yes
|
|
Description of mitigation measures/dates used: Deflectors
|
|
Other Remarks: Water surface temperatures during the project ranged from 28.3°-24° C, and mid-depth temperatures ranged from 28.3°-24° C.
|
Dredges for Project:
Turtle Takes during Project:
- There were no turtle takes by a dredge
|
|