Mississippi River Gulf Outlet - New Orleans District
Project Information
|
Fiscal Year: 2003
|
Project Dates: 11/20/02 - 1/6/03
|
|
Contract Number: N/A
|
|
Project Description: Bar channel dredging to restore project depth in the Breton Sound segment (channel Miles 9.6 to 4.3) due to severe shoaling caused by Tropical Storm Isidore.
|
|
Maintenace / New Work: Maintenance
|
Federal / Regulatory: Federal
|
|
Total Project Cubic Yards: 2371482
|
Total Days of Dredging: 45
|
Total Hours of Dredging: 0
|
|
|
Type of Material: Mud
|
Disposal Method(s) for Material: Sidecast/agitation (2,370,240 cy) and last load dredge & haul mode (1,242 cy)
|
|
Total Turtle Takes: 0
|
|
|
Observer Company Used: REMSA
|
Predredge Trawling
|
Predredge Trawling Company: N/A
|
|
Predredge Trawling? No
N/A
|
Are Predredge Reports Available? No
|
|
Loggerheads: 0
|
Greens: 0
|
|
Kemp's Ridley: 0
|
Other: 0
|
Relocation Trawling
Relocation Trawling? No
N/A
|
|
Relocation Company: N/A
|
|
Loggerheads:
|
Greens:
|
|
Kemp's Ridley:
|
Leatherbacks:
|
|
Hawksbill:
|
|
|
Total number turtles relocated: 0
|
Are Relocation Reports Available? No
|
|
Are Dredging Records Available? Yes
|
Are original turtle take data still available? No
|
|
Description of mitigation measures/dates used: Deflectors, windows (11/30-3/31)
|
|
Other Remarks: Water surface temperatures during the project ranged from 57.2°-64.4° C, and mid-depth temperatures ranged from 13°-15° C. Due to the uncertainty of water temperatures dropping below 12° C in the Gulf of Mexico, MVN now employs observers and screening year-round (except SWP).
|
Dredges for Project:
Turtle Takes during Project:
- There were no turtle takes by a dredge
|
|