Fiscal Year: 2003
|
Project Dates: 11/14/02 - 12/4/02
|
|
Contract Number: N/A
|
|
Project Description: Bar channel dredging between Miles -1.2 & -15.8.
|
|
Maintenace / New Work: Maintenance
|
Federal / Regulatory: Federal
|
|
Total Project Cubic Yards: 3278620
|
Total Days of Dredging: 21
|
Total Hours of Dredging: 0
|
|
|
Type of Material: Mud, clay
|
Disposal Method(s) for Material: Agitation (2,893,987 CYS) and dredge & haul mode (384,633 CYS)
|
|
Total Turtle Takes: 0
|
|
|
Observer Company Used: Coastwise Consulting
|
Relocation Trawling? No
N/A
|
|
Relocation Company: N/A
|
|
Loggerheads:
|
Greens:
|
|
Kemp's Ridley:
|
Leatherbacks:
|
|
Hawksbill:
|
|
|
Total number turtles relocated: 0
|
Are Relocation Reports Available? No
|
|
Are Dredging Records Available? No
|
Are original turtle take data still available? No
|
|
Description of mitigation measures/dates used: Deflectors, windows (11/30-3/31)
|
|
Other Remarks: Water surface temperatures during the project when observers were on board (11/14-11/30) ranged from 16.1°-22.2° C, and mid-depth temperatures ranged from 15.6°-22.2° C.
|