Section 1: Environmental Testing

ZMR-1-01: The Zebra Mussel: Biology, Ecology, and Recommended Control Strategies (March 1992)

ZMR-1-02: Larval Monitoring in a Chlorine Treatment Program to Prevent Zebra Mussel Settlement in Hydropower Facilities (March 1992)

ZMR-1-03: Louisville District Initiates a Zebra Mussel Monitoring Program (July 1992)

ZMR-1-04: Hand-Held Sampler for Zebra Mussel Collection (July 1992)

ZMR-1-05: Developing a Protocol to Ensure Environmental Compliance in a Zebra Mussel Control Program (July 1992)

ZMR-1-06: Mussel Filtration Rates Using Natural Versus Artificial Particles in Suspension (July 1992)

ZMR-1-07: Inadvertent Transport of Live Zebra Mussels on Barges Experiences in the St. Louis District, Spring 1992 (November 1992)

ZMR-1-08: Environmental Effect of Zebra Mussels: Riverine Studies Initiated in 1991 and 1992 (November 1992)

ZMR-1-09: Transport of Live Zebra Mussels by Barge Experiences in the Louisville District, 1992 (June 1993)

ZMR-1-10: The NEPA Process in a Zebra Mussel Control Program (August 1993)

ZMR-1-11: Evaluating the Susceptibility of Structures to Zebra Mussel Infestation (August 1993)

ZMR-1-12: Collection of Zebra Mussel Samples for Contaminant Analyses (August 1993)

ZMR-1-13: Acclimation Response of Zebra Mussels to Laboratory Testing (August 1993)

ZMR-1-14: Environmental Effects of Zebra Mussel Infestation (May 1994)

ZMR-1-15: A Summary of Federal Regulations Related to Use of FIFRA-Registered Biocides and Region 5, USEPA, Use of These Biocides for Zebra Mussel Control (May 1994)

ZMR-1-16: Bioaccumulation of Contaminants by Zebra Mussels (May 1994)

ZMR-1-17: Distinguishing Zebra Mussels from Quagga Mussels by Sperm Examination (May 1994)

ZMR-1-18: Zebra Mussel Infestation at Black Rock Lock, Buffalo, New York (May 1994)

ZMR-1-19: Procedure for Measuring the Force Required to Remove Zebra Mussels from Substrate (May 1994)

ZMR-1-20: Reports of Zebra Mussel Attachment to Ohio River Division Water Quality Monitors (May 1994)

ZMR-1-21: Shell Shape Differences in Dreissena spp. (May 1994)

ZMR-1-22: Registration Process Required by the USEPA for a New Pesticide (November 1994)

ZMR-1-23: Zebra Mussels at Lock and Dam 6, Upper Mississippi River, January 1994 (November 1994)

ZMR-1-24: Distinguishing the Zebra Mussel, Quagga Mussel, and Conrad's False Mussel Based on Shell Morphology (November 1994)

ZMR-1-25: Use of Bridal Veil to Collect Zebra Mussels (November 1994)

ZMR-1-26: Toxicity and Environmental Effects of Disposal of Contaminated Zebra Mussels (March 1995)

ZMR-1-27: Sediment Toxicity and Bioaccumulation of Contaminants in the Zebra Mussel at Times Beach, Buffalo, New York (March 1995)

ZMR-1-28: Periodic Inspection at Black Rock Lock--A Review of Procedure (March 1995)

ZMR-1-29: Introduction and Spread of Dreissena polymorpha in the U.S. Inland Waterway System, 1992-93 (September 1995)

ZMR-1-30: Zebra Mussel Densities in St. Paul District, 1991-94 (September 1995)

ZMR-1-31: Status of Zebra Mussel Infestation in Oklahoma (September 1995)

ZMR-1-32: Tolerances of Zebra Mussels to Various Temperatures in the Mississippi and Ohio Rivers, 1988-1992 (September 1995)

ZMR-1-33: Influences of Zebra Mussels on Conditions at the Sediment-Water Interface (January 1998)

ZMR-1-34: Impacts of Zebra Mussel Infestations on Water Quality (January 1998)

ZMR-1-35: Nutrient Regeneration by Zebra Mussels: Implications for the Phosphorus Budget of Lake Pepin, Upper Mississippi River (September 1998)