ZMR-3-01: Controlling Zebra Mussel Infestations on Flap Gates Associated with Drainage Structures (March 1992)
ZMR-3-02: Controlling Zebra Mussel Infection in Fire Prevention Systems in Locks that Use Raw Water (March 1992)
ZMR-3-03: Control of Zebra Mussel Infestations on Floating Plant of the U.S. Army Engineer District, Buffalo (March1992)
ZMR-3-04: Strategies for Zebra Mussel Infestations on Waterway Gauging Stations (July 1992)
ZMR-3-05: Components of Hydropower Projects Sensitive to Zebra Mussel Infestations (July 1992)
ZMR-3-06: Environmentally Sound Zebra Mussel Control Strategies at Drainage Structures, Pumping Stations, and Water Intakes (July 1992)
ZMR-3-07: Components of Vessels and Dredges Susceptible to Zebra Mussel Infestations (July 1992)
ZMR-3-08: Components of Navigation Locks and Dams Sensitive to Zebra Mussel Infestations (November 1992)
ZMR-3-09: Control of Zebra Mussels in Service Water (June1993)
ZMR-3-10: Use of Reduced Pressure to Accelerate Death of Zebra Mussels (June1993)
ZMR-3-11: Use of Removable Intake Screens to Reduce Maintenance Problems Associated with Zebra Mussels (August 1993)
ZMR-3-12: Use of Hot-Dip Zinc to Protect a Steel Pipe (August 1993)
ZMR-3-13: Use of a Water-Level Transmitter Not Affected by Zebra Mussel Infestations (August 1993)
ZMR-3-14: Modification of Water Intakes to Reduce Zebra Mussel Infestations (August 1993)
ZMR-3-15: Development of a Zebra Mussel Control Strategy for the Cheatham Power Plant (August 1993)
ZMR-3-16: A Proactive Zebra Mussel Infestation Impact Reduction Strategy (August 1993)
ZMR-3-17: Buffalo District Floating Plant Experience with Zebra Mussels (May 1994)
ZMR-3-18: Chemical Control Research Strategy for Zebra Mussels (January 1998)
ZMR-3-19: Use of Microorganisms and Their Metabolites for Zebra Mussel Control (January 1998)
ZMR-3-20: Design of an In-line Backwash Filtration System for Barkley Dam, Kentucky (January 1998)
ZMR-3-21: Development of an Age-structured Metapopulation Model of Zebra Mussels of Engineers (July 1999)